Canada: ISED Amends RSS-247, Issue 4
On October 8, 2026, Innovation, Science and Economic Development Canada (ISED) published Amendment 1 to RSS-247, Issue 4, Digital Transmission Systems, Frequency Hopping Systems and Licence-Exempt Local Area Network (LE-LAN) Devices. The amendment follows the publication of RSS-Gen, Issue 6, and updates Section 7.3.6.3 on operational requirements for Dynamic Frequency Selection (DFS).
The requirements are intended to protect radar systems operating in the same 5 GHz frequency bands.
The amended section distinguishes between device operating modes:
Master (Controller) Devices: Must comply with the full set of applicable radar detection and mitigation requirements
Client Devices without Radar Detection: Must comply with the channel move time and channel closing transmission time requirements
Operational Requirements
Section 7.3.6.3 specifies the following requirements:
In-Service Monitoring: Devices with radar detection must continuously monitor the operating channel for radar signals between normal LE-LAN transmissions.
Channel Availability Check (CAC): Devices operating in controller mode must check for radar signals before initiating transmission on a channel or switching to another channel.
Channel Move Time: Following radar detection, transmissions on the affected channel must cease within 10 seconds.
Channel Closing Transmission Time:
An initial 200 ms at the beginning of the channel move time
Up to 60 ms of additional intermittent control transmissions during the remaining channel move period
Quiet periods between transmissions are excluded from the aggregate transmission time
For devices with emission bandwidth wholly or partially within 5600–5650 MHz, a 1-second limit applies when using the ETSI EN 301 893 test procedure
Non-Occupancy Period: Channels identified as containing radar signals through CAC or in-service monitoring must remain unavailable for 30 minutes, starting from the time of detection.
Source: