日本での求人募集を開始。 求人情報を見る

現在、規制ニュースは英語のみの提供となっております。ご迷惑をおかけしておりますが何卒ご理解の程よろしくお願いいたします。詳細等ご確認したい場合は弊社問い合わせ先にご連絡ください。

Canada: ISED Amends RSS-247, Issue 4

Canada
Canada
, 2026-11-26
ISED has updated RSS-247, Issue 4, clarifying radar detection and mitigation requirements for LE-LAN master and client devices operating in the 5 GHz bands.

On October 8, 2026, Innovation, Science and Economic Development Canada (ISED) published Amendment 1 to RSS-247, Issue 4, Digital Transmission Systems, Frequency Hopping Systems and Licence-Exempt Local Area Network (LE-LAN) Devices. The amendment follows the publication of RSS-Gen, Issue 6, and updates Section 7.3.6.3 on operational requirements for Dynamic Frequency Selection (DFS).

The requirements are intended to protect radar systems operating in the same 5 GHz frequency bands.

The amended section distinguishes between device operating modes:

  • Master (Controller) Devices: Must comply with the full set of applicable radar detection and mitigation requirements

  • Client Devices without Radar Detection: Must comply with the channel move time and channel closing transmission time requirements

Operational Requirements

Section 7.3.6.3 specifies the following requirements:

  • In-Service Monitoring: Devices with radar detection must continuously monitor the operating channel for radar signals between normal LE-LAN transmissions.

  • Channel Availability Check (CAC): Devices operating in controller mode must check for radar signals before initiating transmission on a channel or switching to another channel.

  • Channel Move Time: Following radar detection, transmissions on the affected channel must cease within 10 seconds.

  • Channel Closing Transmission Time:

    • An initial 200 ms at the beginning of the channel move time

    • Up to 60 ms of additional intermittent control transmissions during the remaining channel move period

    • Quiet periods between transmissions are excluded from the aggregate transmission time

    • For devices with emission bandwidth wholly or partially within 5600–5650 MHz, a 1-second limit applies when using the ETSI EN 301 893 test procedure

  • Non-Occupancy Period: Channels identified as containing radar signals through CAC or in-service monitoring must remain unavailable for 30 minutes, starting from the time of detection.

Source:

https://ised-isde.canada.ca/site/spectrum-management-telecommunications/en/devices-and-equipment/radio-equipment-standards/radio-standards-specifications-rss/rss-247-digital-transmission-systems-dtss-frequency-hopping-systems-fhss-and-licence-exempt-local

お問い合わせ

いつでもご相談ください:

電話番号

+81 45 755 7106

営業時間(CET)

月~金 午前8時~午後6時

ILAC-MRA DAkkS-01 ILAC-MRA DAkkS-01